Tell me about solar designs

It is important to note if there isn’t a fiscal export meter on site, surplus solar generation may ‘spill’ onto the distribution network. Because the electricity is not being measured by an industry standard meter, the owner cannot supply or sell the generation that’s spilling on to the grid.

Export-only
On-site use only
On-site use only plus battery
On-site use and export
On-site use and export plus battery