Preparation (section 5 of 6)
Tell me about solar designs
It is important to note if there isn’t a fiscal export meter on site, surplus solar generation may ‘spill’ onto the distribution network. Because the electricity is not being measured by an industry standard meter, the owner cannot supply or sell the generation that’s spilling on to the grid.